Pigalog 2017 Page 388 Spill Containment

388 No Guff Guarantee Every product. Every penny. Every time. Spill Containment Spill Decks Patented flow-through sump design lets liquid pass from one sump to another; helps you meet containment regs Modular design features bulkhead fittings and predrilled ports to connect to other decks ; ready to use as soon as they arrive Mix and match the sections you need to fit your space and help meet sump capacity requirements Special tools and hardware to connect sections included Low-density polyethylene (LDPE) construction resists UV rays, rust, corrosion and most chemicals Textured grating adds traction and lifts out for easy sump access Translucent white sidewalls allow easy visual inspection Helps you comply with 40 CFR 264.175 for containment of haz waste (depending on size of containers stored and number of deck sections) Helps you comply with 40 CFR 112.7 SPCC Regulations where absorbents, barriers and containment devices can be used to control or prevent oil discharges Helps you comply with 40 CFR 122.26 when used as a BMP in a Stormwater Pollution Prevention Plan NOTE: PIG Heavy Duty Poly Modular Deck and PIG Poly Modular Deck components cannot be joined together due to their different heights. Poly Modular Spill Deck Build up to your required sump capacity with our connectable, sump-sharing decks. Our patented bulkhead fittings let liquids from leaking drums flow from one connected deck to another. PAK529 2-drum Drum tops and funnels are easy to reach! Nonslip grate provides secure foot traction. PAK531 4-drum PAK524 1-drum PAK726 Poly ramp sold on opposite page. Predrilled ports BEST SELLER! Removing the predrilled ports lets you connect deck sections, creating a larger storage or work area and increasing sump capacity. PAK465 PAK524

Previous Page
Next Page